Hancock Iron Ore Slew Bearing Change Outs

Dynamical Construction was engaged to deliver the complete electrical scope required to support the mechanical replacement of two critical slew bearings at Hancock Iron Ore, Mine and Port.

We oversaw the disconnection, removal, and tagging of existing electrical infrastructure in strict compliance with site protocols and sequencing.

  • Client: DG Engineering / Hancock Iron Ore
  • Period: August 2025
  • DC Capabilities: E&I Installation
Project Scope

Slew Bearing Change Outs

Following replacement, our team re-installed all electrical cabling, competed all necessary terminations. We performed the full inspection and testing of all electrical work to ensure compliance with OEM specifications and client standards.

To support a smooth restart, we remained on-site through commissioning, assisting with energisation and functional testing alongside the mechanical and controls teams. The electrical scope was delivered safely and on time.

Head Office / Workshop

50 Coolawanyah Road
Karratha WA 6714

Perth Office

Unit 3, 26 Eastbrook Terrace
East Perth WA 6004