RTIO Paraburdoo Bucketwheel Changeout

Dynamical Construction was contracted to execute the electrical work required for the bucketwheel changeout on Bridge Reclaimer 1 at Paraburdoo. This project entailed the disconnection of all electrical equipment situated on the crab structure, followed by the retraction of cables above the mechanical disconnection point, a crucial step in facilitating the bucketwheel changeout.

Subsequent to this phase, the personnel from Dynamical Construction returned to the project site to reinstate the previously removed cabling and equipment.

  • Client: DG Engineering / Rio Tinto
  • Period: December 2023
  • DC Capabilities: E&I Installations
Project Scope

Bucketwheel Replacement

In the final stages of the project, all cabling underwent thorough termination and testing processes before the re-commissioning of the affected systems. In addition to these tasks, Dynamical Construction provided comprehensive in-house support for control systems throughout the duration of the project.

Head Office / Workshop

50 Coolawanyah Road
Karratha WA 6714

Perth Office

Unit 3, 7 Tully Road
East Perth WA 6004