Rio Tinto Paraburdoo Bucketwheel Changeout
Dynamical Construction was contracted to execute the electrical work required for the bucketwheel changeout on Bridge Reclaimer 1 at Paraburdoo. This project entailed the disconnection of all electrical equipment situated on the crab structure, followed by the retraction of cables above the mechanical disconnection point, a crucial step in facilitating the bucketwheel changeout.
Subsequent to this phase, the personnel from Dynamical Construction returned to the project site to reinstate the previously removed cabling and equipment.
- Head Client: Rio Tinto
- Period: December 2023
- DC Capabilities: E&I Installation
Project Scope
Bucketwheel Change Out
In the final stages of the project, all cabling underwent thorough termination and testing processes before the re-commissioning of the affected systems. In addition to these tasks, Dynamical Construction provided comprehensive in-house support for control systems throughout the duration of the project.
Perth Office
Level 5, 143 St Georges Terrace
Perth WA 6000
Karratha Office / Workshop
1537 Pyramid Road
Karratha Industrial Estate WA 6714